Seneca Healthcare District New Hospital Planning Team has diligently worked on the New Hospital Project. Throughout the entire process, the team evaluated and considered the overall cost of the new hospital with every decision. An example of this is the selection of component build. Our team has selected component build as a way to build quickly and cut overall construction costs. The current renderings seen throughout the existing campus are proposed conceptual designs. The team would like the final design to look similar to the proposed conceptual design but will continue to be conscientious of the budget throughout the process of selecting the final materials for the facade.